Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 15 results ...

Ballesteros-Pérez, P, Skitmore, M, Pellicer, E and Zhang, X (2016) Scoring Rules and Competitive Behavior in Best-Value Construction Auctions. Journal of Construction Engineering and Management, 142(09).

Chan, A P C, Javed, A A, Lyu, S, Hon, C K H and Wong, F K W (2016) Strategies for Improving Safety and Health of Ethnic Minority Construction Workers. Journal of Construction Engineering and Management, 142(09).

Chen, Y, Dib, H, Cox, R F, Shaurette, M and Vorvoreanu, M (2016) Structural Equation Model of Building Information Modeling Maturity. Journal of Construction Engineering and Management, 142(09).

De Jorge Moreno, J, De Jorge Huertas, V and Rojas Carrasco, O (2016) Assessment of the Efficiency of the Spanish Construction Industry Using Parametric Methods: Case Study. Journal of Construction Engineering and Management, 142(09).

Dursun, O and Stoy, C (2016) Conceptual Estimation of Construction Costs Using the Multistep Ahead Approach. Journal of Construction Engineering and Management, 142(09).

Fang, D, Zhao, C and Zhang, M (2016) A Cognitive Model of Construction Workers’ Unsafe Behaviors. Journal of Construction Engineering and Management, 142(09).

Goodrum, P M, Miller, J, Sweany, J and Alruwaythi, O (2016) Influence of the Format of Engineering Information and Spatial Cognition on Craft-Worker Performance. Journal of Construction Engineering and Management, 142(09).

  • Type: Journal Article
  • Keywords: Cognitive analysis; Spatial cognition; Labor productivity; Engineering information delivery; Labor and personnel issues;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001157
  • Abstract:
    A series of field trials with pipefitters in North America was conducted to explore how their spatial cognition influenced their performance on a scale model assembly task. Participants were provided one of three information formats, traditional, two-dimensional (2D) isometric drawings, 2D isometric drawings supplemented with a 2D visual rendering of a three-dimensional (3D) image of the assembly, and 2D isometric drawings supplemented with a 3D physical model of the assembly. Card rotation and cube comparison tests were administered to measure spatial cognition. This paper’s primary contribution centers around the discovery that individual spatial cognition significantly influenced the pipefitter’s performance, but the format of information can neutralize the effect. Both the information format and spatial cognition significantly influenced performance. When only 2D information was provided, participants with relatively low spatial cognition performed significantly worse than participants with relatively higher spatial cognition. When the 2D isometric drawings were supplemented with 3D information, participants with lower spatial cognition were able to complete the model assembly as efficiently and effectively as participants with higher spatial cognition.

Govan, P and Damnjanovic, I (2016) The Resource-Based View on Project Risk Management. Journal of Construction Engineering and Management, 142(09).

Hanna, A S (2016) Benchmark Performance Metrics for Integrated Project Delivery. Journal of Construction Engineering and Management, 142(09).

Hosseini, S M A, de la Fuente, A and Pons, O (2016) Multicriteria Decision-Making Method for Sustainable Site Location of Post-Disaster Temporary Housing in Urban Areas. Journal of Construction Engineering and Management, 142(09).

Nguyen, L D, Tran, D Q and Chandrawinata, M P (2016) Predicting Safety Risk of Working at Heights Using Bayesian Networks. Journal of Construction Engineering and Management, 142(09).

Ramsey, D, El Asmar, M and Gibson, G E (2016) Quantitative Performance Assessment of Single-Step versus Two-Step Design-Build Procurement. Journal of Construction Engineering and Management, 142(09).

Shealy, T, Klotz, L, Weber, E U, Johnson, E J and Bell, R G (2016) Using Framing Effects to Inform More Sustainable Infrastructure Design Decisions. Journal of Construction Engineering and Management, 142(09).

Signor, R, Love, P E D and Olatunji, O (2016) Determining Overpricing in Brazilian Infrastructure Projects: A Forensic Approach. Journal of Construction Engineering and Management, 142(09).

Wang, C, Zhang, S, Du, C, Pan, F and Xue, L (2016) A Real-Time Online Structure-Safety Analysis Approach Consistent with Dynamic Construction Schedule of Underground Caverns. Journal of Construction Engineering and Management, 142(09).